City Tower Manchester Re-rope
Project Overview
Replaced a set of 6 x 13mm x 300m ropes for City Tower, Piccadilly Plaza in Manchester. Our in-house scaffolding team installed a custom single-level scaffold into the shaft, enabling landing doors to be closed to protect engineers and building users. Fully inspected all associated pulleys and sheaves. New wedge type anchorages and certified factory-made ends were installed. The work required a team of four and was completed over a single weekend to minimise disruption.
Need similar support?
Contact our trade engineering team today for a quote.
Other Projects

Goods Lift Servicing
Large twin ram goods lift in a major department store required urgent servicing. We supplied and fitted 2 new ram seals, provided new hydraulic oil, and completed a full pit clean. All works were completed safely and efficiently in just 2 days.
View Case Study
Urgent Radicon Gearbox Repair
Responded to an urgent customer breakdown involving a heavily degraded Radicon gearbox. We performed a complete strip down, overhaul, and refurbishment of the unit, restoring it to optimal working condition and returning the lift to service rapidly.
View Case Study
Stockport Mill Lift Repair
Attended site to re-line brakes at a mill in Stockport. Upon inspection, the original brake drum was found to be cracked. With a 4-week lead time for a replacement from the OEM, our precision engineering team manufactured a custom replacement drum in-house. It was installed alongside the newly re-lined brake arms, getting the lift back in service without the extensive wait.